Login to enhance your online experience. Login or Create an Account
Logo
Shopping Cart

Shopping Cart 0 Items (Empty)

Massey Ferguson MF230 MF235 MF240 MF245 MF250 tractor factory workshop and repair manual download

Tools & consumables (minimum)
- Metric/imperial hand tools: sockets (8–24 mm), ratchet, extensions, wrenches.
- Torque wrench (range 5–150 Nm).
- Screwdrivers, pliers, hose-clip pliers.
- Utility knife, wire brush, rags.
- Drain pans for coolant and oil.
- Jack and axle stands or ramps / tractor support stands.
- Drill + bits, step drill, grinder/cut‑off wheel (if trimming sheet metal).
- Welder (MIG/TIG) or good quality brackets and bolts for mounting.
- Measuring tape, marker, masking tape.
- Mandrel-bent aluminum or stainless intercooler piping (preformed preferred), silicone couplers, T-bolt clamps.
- Intercooler core (sized for 2–3 L diesel, typically 50–63 mm OD piping), mounting brackets.
- New hoses, clamps, gaskets, turbo inlet/outlet seals (if applicable).
- Thread locker and anti-seize.
- Coolant (spec per tractor), engine oil (if turbo added), brake cleaner.
- Pressure tester (cooling system) or soapy water bottle for leak check.
- Personal protective equipment: gloves, eye protection, hearing protection.

Safety precautions (non-negotiable)
- Park on level ground, apply parking brake, chock wheels. Support tractor with stands — never rely on a jack.
- Let engine cool fully before opening coolant system. Hot coolant = severe burns.
- Disconnect negative battery terminal before major work.
- Depressurize intake system (if turbocharged) by cranking briefly with fuel shut off — or just ensure ignition off and wait.
- Wear eye protection when cutting/grinding/welding. Ventilate when using solvents.
- If welding on fuel or oil lines nearby, drain/cover and keep fire extinguisher handy.

Two common scenarios — pick the applicable procedure below. Follow exactly for that case.

A. Servicing / replacing an existing intercooler (repair)
Purpose: remove, inspect, repair/replace intercooler core, hoses, clamps, reassemble and pressure test.

Step-by-step
1. Preparation
- Cool engine; disconnect negative battery.
- Place drain pan under radiator; drain coolant to level below intercooler hoses.
- Remove air cleaner assembly and any shrouds blocking access.
2. Label and remove hoses/piping
- Tag each hose/pipe for location. Loosen hose clamps on intercooler inlet/outlet and remove hoses.
- Remove any sensors (MAP, temp) fitted to the piping; cap openings to prevent contamination.
3. Detach intercooler
- Support intercooler with one hand, remove mounting bolts/brackets (use socket/wrench).
- If welded brackets, cut carefully and grind smooth for replacement bracket fitting.
4. Inspect & clean
- Inspect core for leaks (oil/sooty deposits), fins for damage, internal blockages. Brush fins gently with soft wire or fin comb.
- Pressure test core: seal one end, pressurize to ~0.5–1 bar (7–15 psi) with soapy water; watch for bubbles.
5. Replace parts if needed
- If core leaks or is internally clogged, replace intercooler core.
- Replace all silicone hoses and clamps; replace gaskets/seals on mating flanges.
6. Reinstall
- Fit new/existing intercooler into position using new or repaired brackets. Torque mounting bolts snugly (hand-tight then torque moderately — M8 ≈ 20–25 Nm, M10 ≈ 40–55 Nm typical; consult service manual if available).
- Fit silicone couplers with T-bolt clamps; tighten clamps evenly to avoid crushing silicone.
7. Refill and test
- Refill cooling system to spec, bleed air per procedure (open bleed screw if fitted; run engine until thermostat opens and top-up).
- Pressure-test intake piping at idle or use soapy water on joints under boost.
- Check for coolant or air leaks, verify intercooler piping secure and free from rubbing.
8. Final check
- Road/test under load, monitor boost and temperature. Re-torque clamps after first run.

B. Retrofitting an intercooler (turbo conversion or adding aftercooler)
This is more involved: adding turbo/intercooler requires turbocharger, oil feed/return plumbing, exhaust manifold, intercooler core and piping, and possible intake manifold modifications.

Step-by-step
1. Plan & source parts
- Turbo that suits engine displacement (seek a unit matched to 2–3 L diesel; reputable used/new Garrett/KKK style).
- Intercooler core sized to accept ~2–3 in (50–63 mm) piping; core length ~400–600 mm depending on mounting space.
- Mandrel-bent pipes, silicone couplers, T-bolt clamps, oil feed banjo, oil return drain line (gravity drain to sump), oil filter adapter if required.
- Exhaust downpipe compatible with tractor clearance.
2. Preparation & safety
- Same safety steps as above. Remove bonnet/side panels for access. Disconnect battery.
3. Install turbo + exhaust manifold
- Fit turbo to manifold with new gaskets. Install turbo oil feed (from high-pressure oil source) and return (to sump/drain area) — ensure return line has continuous downhill run with no traps. Use braided lines and banjo bolts with crush washers as required.
- Torque turbo to manifold per bolt size; use anti-seize on studs.
4. Locate intercooler & fabricate mount
- Choose a location with good airflow: in front of radiator (space permitting) or side-mounted with ducting. Avoid blocking radiator cooling; if front-mounted, you may need slim core or move radiator back slightly.
- Fabricate brackets (welded steel) and rubber mounts to isolate vibration.
5. Fit intercooler core & piping
- Measure and cut piping runs: turbo outlet -> intercooler inlet; intercooler outlet -> intake manifold. Minimize sharp bends; use mandrel bends and long radius curves. Use 2–2.5 in (50–63 mm) internal diameter piping typically for this engine class.
- Use silicone couplers with T-bolt clamps at every joint. Ensure piping has some flex to isolate vibrations.
6. Intake manifold adaptation
- Where intercooler outlet mates to intake, fit a suitable flange or coupler. If intake manifold needs modification, use a fabricated flange or a turbo-specific intake manifold.
7. Coolant & oil checks
- Ensure turbo lubrication lines are fitted correctly and leak-free. Refill engine oil if drained; check levels.
- If the intercooler is air-to-water (rare on these tractors), fit coolant plumbing, heat exchanger, and pump as required and connect to cooling system with correct capacity and bleeding procedure.
8. Secure & protect
- Use heat shields or wrap where piping/exhaust near hoses or wiring. Re-route wiring away from hot components.
9. Start-up & break-in
- Prime oil feed: crank engine to build oil pressure but don’t start immediately to circulate oil in turbo. Start engine, check for oil leaks at feed/return and boost leaks at piping joints.
10. Tuning & final checks
- Adjust fuel delivery (governor/tuner) to suit boosted air — diesel engines will need fuel adjustment to avoid smoke and excessive EGTs. Best done by experienced diesel tech or remapping governor.
- Verify boost pressure not exceeding safe limits for engine (keep conservative), monitor EGTs, oil pressure, coolant temp.
- After 50–100 km/hours of testing re-torque clamps and check all joints.

How each tool is used (concise)
- Torque wrench: final tightening of bolts to specified torque — prevents over/under-torquing.
- Hose-clip pliers / T-bolt clamps: install and evenly tighten couplers without cutting the silicone.
- Drill/step drill: make holes for mounting brackets and for sensor ports if needed (deburred, protected).
- Welder / grinder: fabricate and fit custom brackets & trim body panels; grind smooth for reassembly.
- Pressure tester/soapy water: check for pressurized air leaks on intercooler piping and coolant system leaks.
- Drain pan & pump: capture coolant/oil; pump or suction to refill and bleed if needed.

Replacement parts commonly required
- Intercooler core (if leaking or bent fins)
- Silicone hoses & T-bolt clamps
- Mounting brackets and rubber isolators
- Turbo charger + gaskets (for retrofit)
- Oil feed/return fittings and braided lines
- Intake/exhaust gaskets and seals
- Coolant and engine oil (if drained/refilled)
- New sensors or MAP sensor fitting (if upgrading)

Common pitfalls & how to avoid them
- Insufficient oil return slope on turbo: leads to turbo failure. Ensure straight downhill run with no air pockets.
- Using cheap worm-clip clamps on high-boost joints: they cut silicone, leak — use T-bolt clamps.
- Overly long/too many tight bends in piping: causes pressure drop and turbo lag; keep runs short with smooth mandrel bends.
- Blocking radiator airflow with intercooler core: lowers engine cooling — ensure adequate airflow or use remote mounting with ducting.
- Improperly supported piping: causes fatigue failure — use brackets and rubber mounts.
- Not adjusting fuel/cutting boost: can cause black smoke, high EGT and engine damage. Tune fuel delivery conservatively.
- Welding on bodywork without protection: causes fires — cover fuel lines and always have extinguisher.
- Reusing old gaskets/seals: leads to leaks — replace with new gaskets.

Final verification (before service)
- Coolant topped to correct level and bled of air.
- Oil level correct and turbo oil feed/return leak-free.
- All clamps torqued/secured, piping free from contact with sharp edges or hot surfaces.
- Test under light load, gradually increasing; re-check all joints and re-torque as necessary.

Done.
rteeqp73

You Might Also Like...

Kryptronic Internet Software Solutions